Pool is poured


The pool has been concreted and we're pretty happy with how it's looking...


Because of rain at the time of the concreting, the foot ledge wasn't able to be done and so will need to be added separately.  This will run along the length of the pool on left-hand side in the shot below.


After the concrete was left to cure for a week or so, the neighbour's side was backfilled and pencil-compacted.  The other side (adjacent to where the alfresco will go) has been left, as per our builder's request, for him to do as part of the site works.  That should happen this week, then the house slab can go down!

And our poor neighbour, David, will finally get his long-awaited brickwall - we owe him a carton!